A construction firm you can trust to build your vision.

We are a family-run builder based in Worthing, delivering residential, commercial and refurbishment projects across East and West Sussex. Most of our work is in and around Brighton and Hove.

  • 2004 Company founded
  • Worthing West Sussex base
  • Domestic and commercial

Pictured: St George’s Hill, our extension and remodel of an Edwardian home

BrightonHoveWorthingHurstpierpointPortsladeDial PostPyecombeCrawleySt George’s Hill

Our contracts cover East and West Sussex, most of them in and around Brighton and Hove. Where we build

You will understand our pricing from the outset, and you will know where your project stands from the first day on site to handover. Clear communication, careful programming and strong project management take the pressure out of building.

Finished rear extension with full-width glazed doors opening onto the lawn at Hove Park Villas
Hove Park Villas, Hove: our side and rear extension
  • Transparent pricing

    Whether we tender in the traditional way or negotiate the contract with you, we produce detailed documentation and explain our pricing before work begins.

  • Programme and costs in view

    Before the contract starts and all the way through it, we keep you clear on the programme and the costings.

  • Tidy, safe sites

    We keep the working environment as tidy as we can, train our workforce and have brought on a number of apprentices.

  • Trusted design partners

    We work with local award-winning architects, surveyors and engineers, and can recommend one if you need guidance.

From groundworks to the final finish

One building from the first dig to opening day: the new Link Barn at The Old Barn Garden Centre, Dial Post.

  1. Blockwork foundations for the Link Barn with the Old Barn behind
    Stage 01 of 06: Groundworks

    Groundworks and foundations

    We cleared the old single-storey toilet block and set out the foundations for the Link Barn, between the coffee house and the Old Barn.

  2. Glulam timber frame of the Link Barn standing against the sky
    Stage 02 of 06: Frame

    The glulam frame goes up

    Exposed glulam columns and beams went up next. They echo the oak superstructure of the Old Barn next door.

  3. Walls of the Link Barn closed in around the glulam frame, with high slot windows
    Stage 03 of 06: Walls and roof

    Closing in the frame

    We closed in the walls and roof. The roof takes its pitch and proportions from the Old Barn, and zinc cladding finishes the outside.

  4. Underfloor heating pipes laid across the Link Barn floor under the timber-lined roof
    Stage 04 of 06: Floor

    Underfloor heating

    Underfloor heating pipes went down across the whole floor of the barn, ready for the finishes.

  5. Bespoke timber steps with built-in lighting being fitted in the Link Barn
    Stage 05 of 06: Fit-out

    Bespoke fit-out

    Bespoke timber steps with built-in lighting link the two levels. New toilets and circulation space fill the rest of the barn.

  6. The finished Link Barn seating area under its exposed glulam frame
    Stage 06 of 06: Complete

    Open for business

    The finished Link Barn adds around 155m² of seating, shared by the coffee house and the Old Barn.

Recent projects, domestic and commercial

Current project

Mayberry Garden Centre, Portslade

Two developments side by side. We are building an extension to the south and west of the existing garden centre, and turning the former allotment site next door into a new purpose-built car showroom and service centre.

Follow the current project
Aerial view of Mayberry Garden Centre with the former allotment site beside it
Steel frame of the new car showroom under construction
Roof deck boards laid across the new building
Visual of the finished timber-clad garden centre building with planting and parking

Trusted with historic buildings

We work with specialised materials and complex installations in modern and historic buildings. At Wilbury Gardens we took out the original stained glass, cleaned and repaired it, then sealed it inside 24mm double-glazed units to improve its thermal performance.

Sussex Heritage Trust Awards 2020, Highly Commended
2020

Sussex Heritage Trust Awards

Highly Commended

2017

Sussex Heritage Awards

Small Scale Residential Award winners for our work at Sussex Square, Brighton

2007

Worthing Borough Council, Distinction in Building Awards

For our contribution to the restoration of Luna Restaurant, 10 Montague Place, Worthing

Jurial van and site board outside a finished house
Jurial site team member in high-visibility clothing at Portslade

Large projects with the personal touch of a family business

Richard Johnson, Contracts Director, and Julie Lees, Finance Director, founded Jurial Construction in September 2004. They still hold to the same aim: a first-class service all the time, every time.

They see people as the most important part of the business. Their relationships with clients, designers, architects and contractors rest on trust, honesty and loyalty, and many clients have come back to us with more work over the years.

Health and safety is part of every build: we identify hazards, control risk, and plan, monitor and review our processes at every stage, and we hold our sub-contractors to the same standard.

Tell us about your project

Call or email us to talk it through. We cover East and West Sussex, most of it in and around Brighton and Hove.