See how long your build will take, week by week

Example figuresSet your project and watch the programme change. We programme and price your job properly after a visit.

Switch on JavaScript to change these. The programme shows our example: a two-storey new build of 150 m² with full planning, starting December 2026.

Your project
Project type
150 m²
Storeys
Planning

Drawings, then a planning application. New homes need full planning permission.

Party wall award

Your programme

  1. Design and drawings: weeks 0 to 6.
  2. Planning decision: weeks 6 to 16.
  3. I. Set-up and groundworks: weeks 16 to 20.
  4. II. Foundations and floor slab: weeks 19 to 23.
  5. III. Walls to first floor: weeks 22 to 27.
  6. IV. Upper floor and walls to eaves: weeks 26 to 31.
  7. V. Roof structure and covering: weeks 30 to 35.
  8. VI. Windows and doors in: weeks 34 to 37.
  9. VII. First fix, plaster, second fix: weeks 36 to 48.
  10. VIII. Finishes and handover: weeks 47 to 52.

Before work starts

16 weeks

Drawings, planning

On site

36 weeks

From March 2027

Expected finish

Nov 2027

52 weeks in all

Example budget Example figures

£390,000 to £540,000

Building work only, at example London rates

These are example figures, not a quote. Centurion will price your project properly after a visit.

Send this plan with your enquiry

52 weeks in all, finish Nov 2027See the programme

What can move the dates

These are the usual reasons a building job finishes later than planned. Allow for each one before work starts and the delays stay small.

  • If your job needs planning permission, nothing starts on site until the council decides. They have eight weeks for most householder applications, and new homes can take longer. If they ask for changes, add more time.

  • Building on or near a wall you share with a neighbour means serving them notice first, two months ahead for work on the wall itself. If they do not agree, surveyors draw up an award before that work can go ahead.

  • Your building inspector checks the work at set stages: the foundation trench before the concrete goes in, the drains before they are covered, and the finished job. Each visit has to be booked ahead, or the next trade waits.

  • Heavy rain floods trenches, frost stops concrete and mortar, and high wind stops work on a roof. Groundworks and roofing are the stages that feel the weather most.

  • Steels are made to the engineer's drawings, and windows, roof lanterns and kitchens are made to measure. Each one is ordered weeks ahead so it arrives when the walls are ready for it.

  • Moving a wall, adding a window or changing the kitchen once work has started means new drawings, new orders and sometimes a new approval. Settle the details before we start and your dates stay put.

Try different start months in the planner

An architect's line drawing of a rear extension with a glazed roof, in pale ink on dark paper

Tell us when you want to start

Send us the address, what you want built and the month you have in mind. We will come and look at the job, then set out your programme and price properly.