Your new build, from the drawings to the keys

We build new houses and business premises across Greater London. One builder looks after the whole job, from the empty plot to handover, and you know what happens on site each week.

  • Homes and businessesA new house or new premises
  • All of Greater London32 boroughs and the City
  • Week-by-week programmeAgreed before work starts
The architect's drawing of a two-storey brick house on a London street corner The same house built in pale London stock brick at dusk, its windows lit
Drag across to build the house from its drawing

A new home, or a new building for your business

We look after a new build from the empty plot to the day you get the keys: groundworks, foundations, brickwork, roof, windows, services and every finish, all under one builder and one programme.

For homeowners

A new family house on your own plot, or a replacement house where the old one comes down. One builder answers for the whole job, and you can plan your move around dates we agree at the start.

For businesses

New premises built around the day you need to open. We set the programme with you, keep the site safe and tidy, and tell you as each stage is finished, so you can plan staff, stock and fit-out.

  • Groundworks to handover
  • Built to your drawings and the Building Regulations
  • One programme, agreed before we start
A two-storey house in yellow stock brick under construction at sunset, with scaffold round it and the roof trusses on

A new house, roof trusses on

An empty office floor with brick walls and tall steel windows, ready for the fit-out

New premises, ready for the fit-out

How we build your house, stage by stage

Example programme A two-storey family house, about 36 weeks on site. Your weeks depend on the design, the ground and the planning conditions.

  1. Concrete footings and starter bars in the trenches of a new house, with an excavator on the plot behind

    Footings and foundations

    Example Weeks 1 to 7

    We set up the site with hoarding and welfare, then dig the trenches to the depth on the engineer's drawings. Building control check them before the concrete goes in. The walls come up to ground level and the floor slab goes down.

  2. Stock brick walls of a new house rising to first floor level inside a scaffold

    Walls and floors

    Example Weeks 6 to 15

    Bricklayers bring the walls up course by course, with the scaffold rising alongside them. Lintels go over every opening, the first floor goes in, and the walls carry on up to the eaves.

  3. Timber roof trusses fixed over the brick walls of a new house under a blue sky

    Roof, windows and doors

    Example Weeks 14 to 21

    The roof structure goes on, then the membrane, battens and tiles or slates. Once the windows and doors are fitted the house is weathertight, and the work moves inside.

  4. Timber stud walls with new cables and copper pipes, and plasterboard stacked ready inside a new house

    First and second fix

    Example Weeks 20 to 32

    Electricians and plumbers run the cables and pipes through the walls and floors. The plasterers board and skim, then second fix brings in the sockets, radiators, kitchen and bathrooms.

  5. A finished living room in a new house, with oak floors, white walls and a tall window onto the garden

    Finishes and handover

    Example Weeks 31 to 36

    Decorating, flooring and a snagging walk round with you. Building control make their final inspection and issue the completion certificate, and we hand you the keys.

What you get when we build for you

01 / 06

  • Drawings held flat on a trestle table on site by a hard hat, spirit level and tape measure

    One person to deal with

    You have one contact at Centurion from the first visit to handover. They know where every trade is up to, so one call gets you an answer.

  • House drawings, a scale rule and a hard hat on a desk by a window

    A programme agreed before we start

    We set out the build week by week and go through it with you before work begins, so you can plan your move and your money around real dates.

  • A bricklayer pressing a yellow stock brick into fresh mortar along a line

    The right trade for each stage

    Groundworkers, bricklayers, roofers, electricians, plumbers, plasterers and joiners, each brought in for their stage and checked before the next one starts.

  • A terrace of new houses inside a scaffold, with pallets of bricks stacked neatly on the pavement

    A tidy, safe site

    Hoarding round the plot, materials stacked and covered, the pavement kept clear and the site swept at the end of every day.

  • The front door of a new house in yellow stock brick, with a stone step and planters

    Built to the drawings and the regulations

    We build what your architect drew and the council approved, to the Building Regulations, with building control inspecting at the key stages.

  • Keys hanging in the lock of a new oak front door

    Updates as each stage finishes

    When a stage is done we tell you, show you, and confirm what comes next and when. You will not need to chase us for news.

How long will your new build take?

Choose a new build in the build planner, set the size and your start month, and see each stage laid out week by week with an example finish date. You can send the plan with your enquiry.

See an example programme

36 weeks

on site for a two-storey house Example figures

I Footings and foundations 1 to 7
II Walls and floors 6 to 15
III Roof, windows and doors 14 to 21
IV First fix to second fix 20 to 32
V Finishes and handover 31 to 36

Questions people ask before a new build

New townhouses in yellow London stock brick with dark windows and a planted front

From the drawing to the street

Yes. A new house needs full planning permission from your local council, which in London means your borough. If the plot is in a conservation area or next to a listed building, expect the council to look harder at the design and the materials.

We build to the approved drawings and to any conditions the council attaches to the permission, such as samples of brick or a construction management plan.

Every new building has to meet the Building Regulations: structure, fire safety, insulation, ventilation, drainage, access and more. A building control inspector, from the council or an approved inspector, checks the work at set stages such as the foundations, the drainage and completion.

At the end they issue a completion certificate. Keep it safe: you will need it when you sell or remortgage.

If you build on or up to a wall you share with a neighbour, or dig foundations within 3 metres of their building and deeper than its footings, the Party Wall etc. Act 1996 says you must serve them notice before work starts. Some deeper digs within 6 metres count too.

If they agree in writing, work can go ahead. If they do not, surveyors draw up a party wall award. Allow a couple of months for this before your start date.

It depends on the size of the house, the ground, the design and the weather. As a guide, our example programme for a two-storey family house comes to about 36 weeks on site, once planning is in place.

The build planner gives you example figures for your own project, stage by stage, with a finish month.

If your new house is going up on a plot next door or down the road, yes. We keep the site behind hoarding, tidy and safe, and agree working hours and delivery times with you before we start.

If we are replacing the house you live in now, you will need somewhere else to stay from the day it comes down to handover. The programme tells you how many weeks to plan for.

We walk round the house with you and note anything that needs putting right, then put it right. Building control make their final inspection and issue the completion certificate.

You get the keys, that certificate, and the test certificates and manuals for the heating, the electrics and the appliances, so you know how everything in your new home works.

Tell us about your plot

Send us the address, what you want to build and roughly when you want to start. We will come back to you to arrange a visit, or call you if you prefer.